 | Upgraded the resort electric service.
 | Replaced fuse boxes in all cabins with
circuit breakers.
|
 | Added outlets in bedrooms.
|
 | upgraded main electric service, upgraded
distribution boxes at pole/Office/Rec Center, and service to each
cabin.
|
 | buried all electric wires and removed all
overhead wires.
|
|
 | New Well Pump!
|
 | New hot water heaters for Cabin 1, Cabin 3,
and Cabin 8.
|
 | New furnaces for Cabin 2, Cabin 8, and the
Office.
|
 | Installed new vinyl flooring and carpet in
the Office.
|
 | Repaired a long-existing plumbing problem in
Cabin 5, including new underlayment in the entire cabin and new carpet
in the bedrooms.
|
 | Replaced the flooring in the bathroom of
Cabin 7.
|