May 16, 2000

Yurt Raising!
---------------------

Starting the Lattice wall
We placed the lattice wall at the opposite end of the door opening. Picture taken 05/16/2000.

0516yt1.jpg (69219 bytes)
0516yt2.jpg (78367 bytes) The Lattice wall Unraveled
We spread the lattice wall around the circumference of the yurt.
Picture taken 05/16/2000.

Door in place
The beautiful french doors we're placed at the entrance.  All lumber in the yurt is of best grade fir.
Picture taken 05/16/2000.
0516yt3.jpg (78596 bytes)
0516yt4.jpg (81489 bytes) Fastening to the Drip Edge
Next, we fastened the bottom of the lattice wall to the drip edge.  Picture taken 05/16/2000.

Starting the Tension Ring
We placed three rafters into the tension ring and slowly raised it into position. 
Picture taken 05/16/2000.
0516yt5.jpg (83286 bytes)
0516yt6.jpg (82444 bytes) Tension Ring in Place
You can see the position of the tension ring in this photo.  Picture taken 05/16/2000.

Rafters in Place
We then installed all of the rafters, positioned between the tension wire at the top of the lattice wall and the tension ring at the top.  Picture taken 05/16/2000.
0516yt7.jpg (84242 bytes)

We started installing the snow and wind kit.  There is a stud that goes from the floor of the yurt and is clamped under each rafter using brackets.  Each stud requires 16 screws!  It is slow going, but we should complete that task in the morning.  Then, it's on to the side and top covers!!!

--------------------

"When it comes to humility, I'm the greatest." 
- Bullwinkle Moose

--------------------

 

Send mail to info@danasresort.com with questions or comments about this web site.
All Original Material and HTML Coding Copyright © 2008
by Dana's Lakeside Resort, LLC
All Rights Reserved.